Clean Development Mechanism Projects
Project Title
20 MW waste gas based captive power
Country
West Bengal
Description
The project activity is for the implementation of
a captive power plant with the installation of a waste heat
recovery boiler and a blast furnace gas fired boiler along with the
planned integrated steel plant. The steam generated from waste heat
recovery boiler approx. 52.5T/H and blast furnace gas fired boiler
approx. 35T/H is expanded in a condensing type steam turbine
generator to produce 20MW of power that will displace the same
amount of electricity which would be purchased from the regional
grid without the project.
Project documents
Project Design Document (PDD)