Installation and commissioning for wind energy

Installation is a critical phase in the project; understanding and mitigating the risks and issues not only guarantees that the asset will operate safely, but can provide added business value.

By ensuring that installation is undertaken safely and efficiently, you can maximise the overall operational effectiveness of your asset. From noise and vibration mitigation to second-party surveys and assessments, we ensure that the work undertaken to optimise your asset is applied throughout its operational lifecycle.

We have more than three decades of experience with underwater acoustic consultancy. Our services include measurements, evaluation of noise mitigation, and prediction of the noise from offshore wind turbines. We address both operating turbines as well as construction activities, including piling and dredging.