Find a WIRS accredited self-lay organisation or WIRSAE provider

We operate  the Water Industry Registration Scheme (WIRS) on behalf of water utility companies.

A WIRS accredited self-lay organisation may perform works on the connection of a property to water mains and supplies, dependent on the status and scope of accreditation.We operate the Water Industry Registration Scheme (WIRS) on behalf of water utility companies and the WIRSAE accreditation on behalf of Market Operator Services Ltd. Wholesalers.

Any WIRSAE Provider contracting to carry out accredited work (as defined in the Wholesale Retail Code and detailed in the generic code of practice supplemented by adopting utilities addendums) can be accredited, and registered, under this scheme. Those Adopting Utilities within England that recognise this scheme and will allow WIRSAE Providers holding the appropriate scopes of WIRSAE accreditation to tender for, and if successful, undertake temporary / permanent disconnections and meter installation / replacement works on behalf of Retailers.

There are 156 providers

Toggle filters

Water Industry Registration

Morrison Utility Services - MURS ACCREDITED

Water Industry Registration key

Areas of Work: East Anglia, Midlands, National, North East, North West, Scotland, South East, South West, Wales

Aptus Utilities - MURS ACCREDITED

Water Industry Registration key

Areas of Work: East Anglia, Midlands, National, North East, North West, Scotland, South East, South West, Wales
  • Contactenquiries team
  • Telephone01204 325000
  • Email enquiries@aptusutilities.co.uk
  • Website http://www.aptusutilities.co.uk
  • Notes Includes design related to a pole mounted transformer when such is a “one off situation” and relevant to networks within UCP accredited scopes.-Excludes any other work related to O/H –Design or construction. Includes design and construction of 20kV Distribution sub stations- Coverage: Restricted to and as agreed by CE area only. Project Management O/H Line wood pole work restricted to pole and PMT installation- excludes any other line installation work .

Clancy Docwra - MURS ACCREDITED

  • ContactFrancesca Buck
  • Telephone07870 397478
  • Email Francesca.Buck@theclancygroup.co.uk
  • Website http://www.theclancygroup.co.uk
  • Notes NERS -Clancy also have full approval for design of cable systems up to 11kV and design of secondary distribution substations up to 11kV/400 volts for domestic, commercial and industrial loads from agreed points of connection to DNO networks. Full approval for secondary distribution substation installation up to 11kV/400 volts (excluding testing and commissioning).