We’ve detected that you are using an outdated browser. This will prevent you from accessing certain features. Update browser

Client success stories.

Read a selection of our customer success stories

Case studies

  • Selected

    Selected

    Selected

Showing 1-10 of 156 results
Most relevant

LR certifies Grab to ISO 9001:2015

Date: 22 Nov 2017

Grab and LR pave the way with ISO 9001:2015 certification. Early certification to ISO 9001:2015 demonstrates quality leadership. Read our case study.

Peter Döhle Group: optimally organised with Cloud Fleet Manager.

Date: 13 Jul 2018

Cloud Fleet Manager gives Peter Döhle Group an efficient and reliable global business system that connects onshore staff, offshore crews and external business partners.

Case Study
Marine & Shipping
Software & Digital Services

EDF Energy relies on LR RiskSpectrum to monitor risk at Sizewell B

Date: 18 Jun 2018

LR's RiskSpectrum suite gives EDF Energy real-time risk monitoring capability, based on a fully validated living PSA model.

Case Study
Nuclear
Energy
Software & Digital Services

Risk monitoring for EDF Energy

Date: 22 Jan 2018

Seeing the full risk picture at Sizewell B. Integrated consultancy, advisory and software support for risk monitoring. Read more in our case study.

Case Study: Royal HaskoningDHV and BIM

Date: 27 Mar 2018

LR's Building Information Modelling Level 2 accreditation is helping improve project delivery at Royal HaskoningDHV

Case Study
Construction Industry

Delivering huge boilers smartly

Date: 22 Jan 2018

Certification and inspection of colossal heat recovery boilers using Larsen & Toubro’s latest fabrication techniques. Read more in our case study.

Meeting global specifications

Date: 22 Nov 2017

ISGEC supplies the domestic Indian market and exports its products globally. Key to the group’s leading status is establishing, maintaining and demonstrating a rigorous commitment to quality.

A first for bolted joints: Hydratight and LR

Date: 22 Nov 2017

Setting a benchmark for training bolting flange joint technicians with an independent audit to ASME PCC-1-2013 Appendix A. Read more in our case study.

Training for Huadian Heavy Industries

Date: 22 Jan 2018

Designing and delivering bespoke training with the RES Group for a leading Chinese EPC contractor. Read more in our case study.

Reducing risk with new plant equipment

Date: 22 Nov 2017

Constructing a major new power plant is a high-risk, capital-intensive project. Our client, an established power plant operator in India, wanted support with the supply of equipment. Assets would come to the plant from Chinese vendors.

Can't find what you are looking for?

Hit enter or the arrow to search Hit enter to search

Search icon

Are you looking for?