We’ve detected that you are using an outdated browser. This will prevent you from accessing certain features. Update browser

Client success stories.

Searchable index of recent client success stories

Case studies

  • Selected

    Selected

    Selected

Showing 30-40 of 199 results
Most relevant

Making a European power plant out of components from Asia.

Date: 22 Nov 2017

Our client needed to be confident about the technical quality control process of its main Engineering, Procurement and Construction (EPC) contractor in Asia.

ASC certification aids growth for Loch Fyne Oysters

Date: 22 Jan 2018

Loch Fyne Oysters is a seafoods, fish, meat, oysters and game company which also founded the Loch Fyne restaurant chain

Case Study
Food, Beverage & Hospitality
Primary Production
Food, Beverage & Hospitality

Expert rig reactivation saves client £8m

Date: 16 Jan 2018

Expert rig reactivation saves client £8m

Case Study
Upstream
In-life & Operation
Appraisal & Exploration

Case study: Energy yield assessment (solar farm)

Date: 22 Nov 2017

Here's how we helped our client reduce uncertainty by a third at four of their solar sites.

Case Study
Energy
Solar
Sustainability

A first in continental European certification for Van Leeuwen.

Date: 22 Nov 2017

A first in continental European certification for Van Leeuwen. Focusing on quality with ISO 9001:2015 over a two-year, global journey. Read our case study.

Manufacturing
ISO 9001
Quality

ACP Europe: Defining a food safety culture.

Date: 22 Nov 2017

Beyond conventional industry standards with FSSC 22000 food safety certification

Food, Beverage & Hospitality
Food, Beverage & Hospitality
FSSC 22000

Thales UK: Seeing what’s on the environmental horizon and acting.

Date: 22 Jan 2018

Seeing what’s on the environmental horizon and acting. Gap analysis to help meet revised standard, ISO 14001:2015. Read more in our case study.

Energy
ISO 14001

BAM Nuttall - Improving business performance with BS 11000

Date: 22 Nov 2017

Find out how certification to BS 11000 helped BAM Nuttall improve their supply chain performance

Case Study
Construction Industry
Business Improvement Services

Interconnector: Keeping the gas flowing between the UK and Europe.

Date: 22 Nov 2017

Keeping the gas flowing between the UK and Europe. Integrity engineering fatigue life assessment of strategic pipeline span. Read our case study.

Model answers for a special system.

Date: 22 Nov 2017

Model answers for a special system. Blow-out prevention compliance for a deepwater drill ship, Trinidad & Tobago. Read more in our case study.

Can't find what you are looking for?

Hit enter or the arrow to search Hit enter to search

Search icon

Are you looking for?