We’ve detected that you are using an outdated browser. This will prevent you from accessing certain features. Update browser

Client success stories.

Read a selection of our customer success stories

Case studies

  • Selected

    Selected

    Selected

Showing 30-40 of 163 results
Most relevant

Case study: Giving TEPCO the confidence to restart nuclear reactors

Date: 22 Nov 2017

Independent technical audits for the world’s largest nuclear power plant, Japan, enabling restart following the Fukushima tsunami. Read more in our case study.

Case Study
Energy
Nuclear
Sustainability

Stopping a costly, noisy problem for Statoil.

Date: 22 Nov 2017

Stopping excessive noise levels on a Main Generator A gas turbine exhaust duct, Norwegian Sea, with a custom-built flow distributor. Read our case study.

Saving water, cutting costs and creating regular revenue for a region

Date: 22 Nov 2017

Saving water, cutting costs and creating regular revenue for a region. New $25 million infrastructure project, Permian Basin, Texas. Read our case study.

Keeping offshore decommissioning on track

Date: 22 Nov 2017

Our client was decommissioning several of its offshore assets in the North Sea. The operating company asked us to help with planning support, ensuring each project was as efficient and successful as possible.

LR provides classification and certification services for MISC Berhad

Date: 22 Nov 2017

First to operate in Malaysia’s deep waters. Classification and certification of semi-submersible floating production unit. Read more in our case study.

A cost and plan for decommissioning over 220 offshore assets.

Date: 22 Nov 2017

A cost and plan for decommissioning over 220 offshore assets. Liability estimation and methodology on an asset-by-asset basis. Read our case study.

Terex Trucks: Setting industry firsts for enhanced business.

Date: 22 Jan 2018

Setting industry firsts. Certification to revised quality and environmental standards, ISO 9001:2015 and ISO 14001:2015. Read more in our case study.

Manufacturing
Construction Industry
Environment
ISO 14001

Meeting global specifications

Date: 22 Nov 2017

ISGEC supplies the domestic Indian market and exports its products globally. Key to the group’s leading status is establishing, maintaining and demonstrating a rigorous commitment to quality.

Reducing risk with new plant equipment

Date: 22 Nov 2017

Constructing a major new power plant is a high-risk, capital-intensive project. Our client, an established power plant operator in India, wanted support with the supply of equipment. Assets would come to the plant from Chinese vendors.

Case study: Design review of tidal turbine (Atlantis Resources)

Date: 22 Nov 2017

Pushing the potential of tidal power. Design review and survey of the world’s largest rotor diameter tidal turbine, Orkney. Read more in our case study.

Case Study
Energy
Wave & Tidal
Sustainability
Can't find what you are looking for?

Hit enter or the arrow to search Hit enter to search

Search icon

Are you looking for?