Finding a new way to position a drilling rig.

Date: 22 Nov 2017

Our client contracted us to provide rig positioning quality control (QC) services. This would support the accurate positioning of a DP3, a semi-submersible dynamically positioned (DP) drilling rig, West of Shetland.

Oil & Gas
Upstream
Commissioning, Design & Build

TAQA: From new licence holder to North Sea operator in nine months.

Date: 22 Nov 2017

New licence holder to North Sea operator in 9 months. Supporting the takeover of 6 fields and 30% increased production in 2 years. Read our case study.

Technical advice for a $1.5 billion investment in West African

Date: 22 Nov 2017

Technical advice for a $1.5 billion investment in Petrobas’ West African deepwater offshore operations. Read more in our case study.

Stopping repetitive fatigue failures offshore for Statoil.

Date: 22 Nov 2017

Stopping repetitive fatigue failures offshore. Mechanical failure analysis of gas turbine exhaust ducts. Read more in our case study.

Getting an offshore crane working safely again for Centrica Energy.

Date: 22 Nov 2017

Getting an offshore crane working safely again. Swift, integrity lifting engineering solutions for an ongoing client’s operations. Read our case study.

PetroSA: Putting HSE management on every employee’s agenda.

Date: 22 Nov 2017

New Group HSE management system and procedures, driving cultural change. Read more in our case study.

Well delivery process management, VietGazprom concept to close out.

Date: 21 Jun 2017

Saving $40 million and 50 days. Well-delivery process management, from concept to close out, offshore Vietnam. Read our case study.

Oil & Gas
Upstream
Commissioning, Design & Build
Engineering & Design

Safeguarding Jurong Island petrochemical hub.

Date: 22 Nov 2017

Safeguarding Jurong Island petrochemical hub. Improving the risk and emergency response management system for 100 plus companies. Read our case study.

Identifying risk and improving performance for Fairways Offshore Expl

Date: 21 Mar 2017

Safety and environmental management system (SEMS) audit

Oil & Gas
Upstream
In-life & Operation
Assurance

HollyFrontier: Redefining refinery safety and productivity.

Date: 22 Nov 2017

Redefining refinery safety and productivity. Improving mechanical integrity with a fully integrated, risk-based inspection software solution.