We’ve detected that you are using an outdated browser. This will prevent you from accessing certain features. Update browser

LR AllAssets™

Reliability Centred Maintenance (RCM), FMEA, FMECA.

Abstract network image with numbered points in and out of focus
 

Find the right maintenance frequency based on your priorities - cost, reliability or availability.

AllAssets, LR’s asset performance and risk management software solution, includes AllAssets Maintenance Optimization which incorporates Reliability Centered Maintenance (RCM), Failure Modes and Effects Analysis (FMECA) and Failure Modes and Effects Criticality Analysis (FMECA) modules.

LR AllAssets Maintenance Optimization

AllAssets Maintenance Optimization helps you address the maintenance burden, mitigate operating risks and deliver sustainable equipment reliability, efficiency, and availability. You can confidently establish the safe minimum maintenance levels for reliable and compliant system operation, while reducing costs and unnecessary maintenance. Sophisticated algorithms enable you to deploy predictive modeling to rank your assets based on the most appropriate maintenance strategies.  This allows targeted maintenance performance improvement based on cost, availability, reliability and probability of failure on demand optimization methods.

See Maintenance Optimization in action

With AllAssets Maintenance Optimization our clients have typically been able to reduce the cost of Planned Maintenance by up to 30%, materially extend asset life and demonstrate legislative compliance – seeing almost immediate results and rapid ROI. AllAssets Maintenance Optimization also enhances overall safety, not least by removing vulnerable staff from hazardous environments and demonstrating compliance of Safety and Environmentally Critical Equipment.

  • Optimize Planned Maintenance based on your main concern, whether is it reliability, availability or commerciality amongst other available methods
  • Use our library of models to gain access to a vast number of failure rates and equipment classes and types
  • Use the maintenance optimization module to fine-tune inspection intervals based on historical failure rates
  • Use our criticality analysis feature to add a level of assurance to your analysis from a risk perspective

Find out more

Maintenance Optimization whitepaper
Whitepaper

How much is unplanned downtime costing you?

Optimizing maintenance to increase ROI on your Enterprise Asset Management investment.

Download our Maintenance Optimization whitepaper
Maintenance calculator promo
Online calculator

Is your maintenance budget under pressure?

See how much you could save in just 4 clicks.

Use our maintenance savings calculator

Our expertize applied

Find out how our clients have benefited from Maintenance Optimization:

  • FPSO: Reducing planned maintenance by 40%

    A maintenance strategy review project was carried out on a Sevan 300 Type FPSO on behalf the Duty Holder. The review covered all maintenance disciplines and included both Safety Critical and non- Safety Critical maintenance activities. The project, which took six months, included 5,000 planned maintenance activities.

    All analyses was carried out and hosted in AllAssets online cloud-based software and used to determine revised maintenance activity intervals. Validation workshops were held with onshore and offshore personnel prior to implementation in the CMMS, Maximo.

    Results

    • Net reduction of Planned Maintenance of over 40%.
    • Incorporation of Classification Society requirements.
    • Additional Planned Maintenance introduced for Production Critical Water Injection equipment.
  • Low voltage motors: 65% annual maintenance cost saving

    Our client was scrutinising aspects of their maintenance regime to ensure effort was optimized on equipment that didn’t have an immediate production or safety benefit. This also included reducing preventative maintenance on items with low failure rates or those which can run-to-failure (RTF) with minimal adverse consequences.

    We applied AllAssets Maintenance Optimization to provide optimised maintenance frequencies for our clients Low Voltage (LV) Motor population. The study which took three weeks, included 970 items.

    Results

    • An estimated cost saving of 65% was identified made on annual maintenance on LV Motors.
    • An estimated reduction of 7127 annualised man hours.
    • Recommendations were made in relation to the greasing regime.
  • Safety Critical Equipment: £385k annual maintenance saving

    We reviewed our clients Fire and Gas maintenance for its portfolio of seven offshore UKCS facilities. This involved target analysis of historic testing results and the optimization of testing intervals based on reliability targets for the Safety Critical devices. A total of 7,500 Fire and Gas detectors were in scope and over 8,000 notifications reviewed to determine the reliability of the devices.

    Maintenance was then targeted according to the reliability performance based on the detector types and facility.

    Results

    • Planned Maintenance reduction of 26%, with an estimated annual saving of £385k.
    • Revised maintenance was applied to ensure that specific reliability targets were able to be met.
    • Maintenance effort was re-focused on the areas of greatest risk.

Explore AllAssets

AllAssets give you all the tools you need to create and implement optimized preventive maintenance and inspection plans. Our methodologies include Risk Based Inspection and Maintenance Optimization, incorporating Reliability Centred Maintenance, Failure Modes & Effects Analysis and Failure Modes & Effects Criticality Analysis

Hit enter or the arrow to search Hit enter to search

Search icon

Are you looking for?