We’ve detected that you are using an outdated browser. This will prevent you from accessing certain features. Update browser

White paper: Seven ways to reduce non-productive time of your land rig.

seven_ways_cover_thumbnailDrilling operations can be interrupted by the malfunction of equipment and systems, or the lack of competence of drilling personnel. Aside from the safety implications, these interruptions result in Non-Productive Time (NPT), which is costly.

Our complimentary guide identifies seven ways to reduce non-productive time of your land rig, helping you:

  • Improve maintenance management of your land rig

  • Reduce operating and inspection costs by up to 50%

  • Reduce failures

  • Mitigate against unnecessary downtime

  • Ensure your rig is fit for purpose

  • Identify drilling operational and safety critical equipment

  • Improve crew competency

  • Improve safety

INSIGHTS

What we think

LR's experts regularly share their research and insights.

Can't find what you are looking for?

Hit enter or the arrow to search Hit enter to search

Search icon

Are you looking for?