We’ve detected that you are using an outdated browser. This will prevent you from accessing certain features. Update browser

Client success stories.

Read a selection of our customer success stories

Case studies

  • Selected

    Selected

    Selected

Showing 1-10 of 163 results
Most relevant

Towards tomorrow's low-carbon economy

Date: 8 Jan 2020

Our report for the OGA explores upstream opportunities in UK waters to cut greenhouse gas emissions.

Breaking down the decommissioning cost for risk free asset acquisition

Date: 1 Jul 2019

Our client was looking to acquire a number of assets and needed to review costs, risks and remaining reserves to ascertain if the investment was worthy.

Oil & Gas
Recycling & Decommissioning
Recycling & Decommissioning
Transaction Advisory Services

Diamond Drilling: Reducing downtime by assuring MODU design

Date: 8 Mar 2018

Diamond Drilling: Reducing downtime by assuring MODU design

Case Study
Oil & Gas
Upstream
In-life & Operation

Supporting TransCanada with Cianbro/Three Phase Construction.

Date: 22 Nov 2017

SGC provided electrical engineering and survey support for the Kibby Wind Power Project.

Onshore Wind
Sustainability
Engineering & Design

Driving the pre-construction phases of First Wind's Stetson Wind.

Date: 22 Nov 2017

First Wind's Stetson Wind project in Maine has been operational since 2008. Here's how SGC Engineering helped make it happen.

Onshore Wind
Sustainability
Engineering & Design

Case Study: Royal HaskoningDHV and BIM

Date: 27 Mar 2018

LR's Building Information Modelling Level 2 accreditation is helping improve project delivery at Royal HaskoningDHV

Case Study
Construction Industry

Paving the way for First Wind's Rollins Wind.

Date: 22 Nov 2017

First Wind's Stetson Wind project in Maine has been operational since 2008. Here's how SGC Engineering helped make it happen.

Onshore Wind
Sustainability
Engineering & Design

Katoni: Make health and safety matter.

Date: 13 Feb 2019

Katoni achieves ISO 45001 with Lloyd's Register. This case study states the preparation process from OHSAS 18001 to ISO 45001 Katoni took for a successful migration.

ISO 45001
Health & Safety

Knowing more to transport gas with confidence.

Date: 22 Nov 2017

Our applied technology experts in Halifax, Canada, were asked to undertake a risk assessment of a new client project. LNG and LPG ships would transit through environmentally sensitive waters in Australia and the US.

ISRA membership for Şimşekler

Date: 26 May 2016

Şimşekler Ship Recycling Company: Making history in Turkey. Facility assessment for ‘A’ Membership of the International Ship Recycling Association.

Case Study
Marine & Shipping
Recycling & Decommissioning
Consulting, Analysis & Advisory
Can't find what you are looking for?

Hit enter or the arrow to search Hit enter to search

Search icon

Are you looking for?