MARINER Partnership – Validation and Demonstration of a Reliable, Efficient, Scalable, and Low-Cost PEM Fuel Cell System

Overview

MARINER will develop and validate a modular, scalable 1 MW Proton Exchange Membrane (PEM) fuel cell system specifically designed for maritime applications, directly addressing key barriers to decarbonizing shipping. Aligned with the CH-JU’s objectives, the project targets critical cost, efficiency, and lifetime performance breakthroughs. 

Objectives

The main objectives of MARINER project are to :

  1. Design a modular multi stack architecture that follows the open StaSHH interface, integrates shared balance of plant, fault tolerant power electronics and hydrogen efficient recirculation, and meets < 1 200 €/kW CAPEX and ≥ 55 % (LHV) net efficiency targets. 
  2. Assemble and validate a 200 kW prototype, then scale to a containerised 1 MW demonstrator, undergoing 1 000 h endurance under moist, salty and temperature varied conditions, while a 200 kW module accrues the equivalent of 40 000 h through system level accelerated stress testing.
  3. Develop open source digital twins, diagnostics and health conscious control, enabling 100 × faster than real time simulation, predictive maintenance and safe load sharing that extends lifetime towards the 80 000 h 2030 KPI.
  4. Quantify total cost of ownership, life cycle impacts and circularity, benchmarked against diesel, LNG and battery alternatives, and publish best practice guidelines, safety procedures and a roadmap to type approval (TRL 9).
  5. Engage end users, regulators and parallel EU projects (StaSHH, HyShip, ZEWT, etc.), ensuring harmonised test protocols, feedback to standards and a clear market uptake path for European OEMs and SMEs.

By delivering a marine ready, scalable 1 MW PEMFC building block and the tools and evidence to de risk commercial adoption, MARINER will convert stack level breakthroughs into a deployable, certifiable, economically viable power train family, accelerating the point where zero emission shipping is the rational business choice, not an R&D pilot.

The MARINER consortium consists of 13 partners with an overall budget of €7.0M over 4 years with 100% Lump Sum grant from EU.

Deliverables

We are leading WP10 Regulatory Aspects and Safety Assessment with the following deliverables:

  • D10.1 Review of Regulatory aspects of FC systems and Gap analysis (M09)
  • D10.2 Risk assessment of fuel cell power system development (M15)
  • D10.3 Risk assessment of modular arrangement of fuel cell power system (M36)
  • D10.4 Safety analysis and Recommendations on FC Power systems (M45)

Duration

2026 - 2030

Partners

  1. Norce Research As (NORCE), Norway

  2. Association Pour La Recherche Et Le Developpement Des Methodes Et Processus Industriels (ARMINES), France

  3. Vard Electro AS (Vard Electro AS), Norway

  4. Genevos SAS (GENEVOS), France

  5. University Of Stuttgart (USTUTT), Germany

  6. Lloyd's Register EMEA (LR EMEA), United Kingdom

  7. Ethniko Kentro Erevnas Kai Technologikis Anaptyxis (CERTH), Greece

  8. Dowel Innovation (DOWEL), France

  9. Sustainable Energy AS (SEC), Norway

  10. Commissariat A L Energie Atomique Et Aux Energies Alternatives (CEA), France

  11. Kiara Naytiki Etaireia (KIARA), Greece

  12. LMG Marin France (LMG FR), France

  13. Scorpio Ship Management sam (SCORPIO) 

     

Funding:

 

 

This project MARINER has received funding from the European Union’s Horizon Europe research and innovation programme under grant agreement No 101251528.